What Do You Say When Ordering Concrete?
When ordering concrete, it is important to thoroughly discuss the specific requirements of the job with a dispatcher. Knowing the specifics of the job, such as the size and type of concrete mix, delivery location, access to the site, and availability of equipment, will help prevent any miscommunications and ensure that the order is fulfilled correctly.
It is also important to specify any additives required in the concrete mix, such as pigments, fibre reinforcement, or air entrainment. All of these factors can have an impact on the cost of the order, so it is also important to ask for a quote prior to placing an order.
Tips When Ordering Premixed Concrete
When ordering premixed concrete, the following tips can help ensure that all of a customer’s requirements are met. First, place the order in advance to allow adequate time for delivery and production.
Second, be sure to know the quantity of concrete that is required. Trying to estimate how much concrete is needed based on the size of the project is not always accurate.
Third, plan for the right time and temperature for delivery. Ideally, the concrete should be poured when temperatures are between 40 and 70 degrees Fahrenheit, as this will help ensure that the concrete sets properly.
Fourth, consider the height and weight restrictions when ordering concrete. Premixed concrete can weigh up to 4,000 pounds per cubic yard, so it may be necessary to limit the height of the concrete to ensure safety.
Finally, if you need delivery within 24 hours, be sure to ask the dispatcher if they are able to provide same-day delivery.

Need assistance finding concrete delivery near you?
Get a QuoteWhat Is The Rule Of Thumb For Ordering Concrete?
When ordering concrete, it is wise to order about 10% more than you think you will need. It's always better to end up with a bit too much concrete rather than not enough, to ensure you have enough for the project. This rule of thumb allows for any unexpected accidents such as spills. In the event that you have too much concrete left over, the company you bought it from may take it back.
Is It Cheaper To Mix Your Own Concrete Or Have It Delivered?
It is cheaper to mix your own concrete if the design of your project calls for a standard concrete mix without any special additives. However, as the complexity of the mix increases and the project size grows, premixed concrete becomes more cost-effective. As project size increases, the cost savings from mixing the concrete yourself diminish because of the cost of equipment and labour. It is also important to remember that the cost of delivery should be factored into the equation.
How Do You Handle Unload Time?
Once the truck arrives with the concrete, it is important to avoid any unnecessary idle time or extra trips. Concrete can only remain in transit for about two hours before it begins to lose strength, so if more time is required, sacking agents should be added to the mix which will extend the unloading time.
If the job requires multiple trucks, it is important to let the dispatcher know so they can arrange delivery in a staggered fashion. Once the concrete is delivered, it must be placed and finished as soon as possible. Working within 45 minutes of delivery is ideal, as this will help ensure that the concrete sets correctly.